Project Update 10/8/2020

Crews continue working along SW 4th St between SW 7th Ave and SW 8th Ave installing new curbs and parking areas on the North side of SW 4th Street.

More

Project Update 10/7/2020

Crews finished the Pervious Concrete in Alleyway 2 today. On SW 4th St between SW 7th Ave and SW 8th Ave the new curbs are being framed up and ready to pour concrete. The drainage crew continues working at SW 7th Ave and SW 2nd St installing new drainage pipe.

More

Project Update 10/6/2020

Crews continue pouring the Pervious Concrete in Alleyway 2. Along SW 7th Ave at SW 2nd Street, crews are installing new drainage structures and pipe.

More

Project Update 10/05/2020

Crews continue pouring the pervious concrete in Alleyway 2. Along SW 4th St between SW7th Ave and SW8th Ave crews continue with the reconstruction of the roadway. On SW 7th Ave near SW 2nd St crews continue with installing new drainage pipes.

More

Project Update 10/2/2020

Work Completed this Week: SW 7th Ave between SW 2nd Street to SW 3rd Street – New Drainage Structures and Pipes at SW 2nd Court have been installed. The 8” RWM is now installed to SW 2nd Court. SW 4th Street from SW 8th Ave to SW 10th Ave – The new 8” Rock Base… Continue reading

More