Project Update 5/7/2021

Work completed this week: SW 7th Ave between SW 6th St to SW 7th St – Crews began excavation and placing new base rock for the pavement reconstruction. SW 3rd Ct between SW 8th Ave to SW 10th Ave – Crews completed installing the new sidewalks along the South Side and began installing new sidewalks… Continue reading

More

Project Update 5/6/2021

Crews continue installing new sidewalks along SW 3rd Ct today. Crews continue grading on SW 6th St for the 1st lift of asphalt. Bollards continue to be installed in Alleyway 6, and crews are completing a sewer main repair on SW 7th Ave between SW 1st St to SW 2nd St.

More

Project Update 5/5/2021

Crews are grading the base rock on SW 6th St in preparation for asphalt. On SW 7th Ave south of SW 6th St, crews are excavating for the new subgrade. Crews are working on the new Bollards in Alleyway 6. On SW 7th Ave from SW 1st St to SW 2nd St, crews are setting… Continue reading

More

Project Update 5/4/2021

Crews continue pouring new sidewalks along SW 3rd Ct. At SW 6th St & SW 8th Ave, crews are excavating for the pavement reconstruction. Along SW 6th St from SW 5th Ave to SW 6th Ave, crews are grading the rock base for the 1st lift of asphalt.

More

Project Update 5/3/2021

Crews continue grading on SW 3rd Ct for new sidewalks. On SW 7th Ave between SW 6th St to SW 7th St, crews are beginning the Pavement Reconstruction. Tomorrow crews will be working at SW 8th Ave at SW 6th St. Please follow posted Detour on SW 8th Ave tomorrow.